Southeast Missourian Renovation
06/20/2005
Punch List
 
Download Drawing Viewer             Download Spec. Viewer                          

                   

These documents are available to Penzel employees and subcontractors' as part of our project management structure.  Please utilize these resources to support the construction efforts.  Any misuse of this proprietary information will result in loss of privileges.

Glen Hinkebein Project Manager
          Cell - 573-979-9697
          Fax - 573-243-2425
          Email - glenh@penzel.com
Dave Mirgeaux Site Superintendant
          Cell - 573-979-9704
          Job Site Phone -
          Job Site Fax -
          Email - david.mirgeaux@sbcglobal.net

 

SITE CONDITIONS:

We strongly encourage subcontractors and material suppliers to stay current with construction progress and scheduling.  A site visit can be set-up with the Project Manager or Estimator.

 GENERAL CONSTRUCTION NOTES:

PENZEL IS THE GENERAL CONTRACTOR FOR THIS PROJECT.   THE ARCHITECTURAL FIRM IS KIKU OBATA & COMPANY. PROJECT ARCHITECT IS KEVIN J. FLYNN, AIA. THEY ARE LOCATED AT 6162 DELMAR BLVD., SUITE 200, ST. LOUIS, MO 63112-1203. PHONE NUMBER: (314-361-4716). TO UTILIZE OUR PROPRIETARY INFORMATION, PLEASE CALL OUR OFFICE TO OBTAIN A PASSWORD. We can provide drawings and any other material to subcontractors and suppliers.    THE PROJECT ENTAILED THE COMPLETE RENOVATION AND UPDATING TO A THREE LEVEL CAST-IN-PLACE CONCRETE BUILDING AT 301 BROADWAY. THE RENOVATION AND UPDATING OF THE ADJOINING WOOD BUILDING AT 313 BROADWAY, WITH ADJOINING PASSAGES ALSO INCLUDED. This scope included structural, architectural, mechanical, electrical, plumbing, fire safety, and all associated trades. The historical significance of the buildings is included in the design plan.     Faxed bid forms will be accepted until the published bid time and date. Subcontractors are responsible for confirmation of receipt of the bid form via a follow up phone call to the Penzel point of contact.   Subcontractors are required to include the owner and Penzel as additionally insured.   Subcontractors are required to adhere to all Penzel and OSHA Safety Policies. The Penzel Standard Form Contract will be utilized without modification for all subcontractors. A copy of the Penzel Safety Policy or Standard Form Contract are available upon request. The OSHA Safety and Health Requirements Manual is available on the OSHA web site at www.osha.gov . Subcontractors are urged to review the plans, specifications and all associated addendums that were used for design of this project.   Subcontractors are responsible for clean up of material and waste associated with their scope of work. Clean up will be coordinated with the on-site superintendent and will be performed on a daily basis. If the subcontractor is deemed unresponsive to this requirement, Penzel will perform the activity at the expense of the subcontractor.   THIS PROJECT IS NOT TAX EXEMPT. Missouri sales and/or use taxes are applicable to permanent materials on this project.