SITE VISIT:
We
strongly encourage subcontractors to visit the construction site prior to
submitting a proposal. A site visit can
be set-up with the Project Manager or Estimator.
GENERAL NOTES:
In regards to the above referenced project, Penzel is preparing a
proposal as General Contractor and is currently requesting subcontractor and
material supplier proposals.
The Project Designer is Koehler Engineering. Plans
may be viewed at the Engineer’s Office, Penzel's Office or on this Web Site.
We request your quotation on or before 4:00 p.m., Wednesday, July
18, 2012.
We recommend that you frequently check our website for project updates.
If you have any questions, do not
hesitate to contact us.
The Owner will issue a tax exempt certificate, which will apply for
the project’s materials.
Faxed bid forms will be accepted until Bid Time.
Subcontractors are responsible for confirmation of receipt of the bid
form via a follow up phone call to the Penzel point of contact.
Penzel Construction Company, Inc., the Owner, and all other parties
as required by the contract are added as primary additional insured under
Subcontractors Comprehensive General Liability policy.
For additional information see “project
insurance requirements” on this web site.
Subcontractors are required to adhere to all Penzel, and OSHA
Safety Policies. The Penzel Standard Form
Contract will be utilized without modification for all subcontractors.
A copy of the Penzel Safety Policy or
Standard Form Contract is available upon request.
The OSHA Safety and Health Requirements Manual is available on the OSHA
web site at www.osha.gov.
Subcontractors are urged to review the plans, specifications, and
all associated addendums that were used for design of this project.
Subcontractors are responsible for cleanup of material and waste
associated with their scope of work. Clean-up
will be coordinated with the on-site superintendent and will be performed on a
daily basis. If the subcontractor is
deemed unresponsive to this requirement, Penzel will perform the activity at the
expense of the subcontractor.
This project is tax exempt. Missouri
sales and/or use taxes are NOT applicable to permanent materials on this
project.